Z% 9x4@115FTP+4'REST@50
- Cycling
- 1h 36mTime
- 133Stress
- 0.91Intensity
- 30Popularity
About this workout
This session ramps up your aerobic ceiling with 9 sets of 4 minutes at 115% FTP, pushing your limits and mimicking the intensity of those decisive race moments. Perfect for building the capacity needed for when the road kicks up or you need to respond to a group ride surge.
Workout structure
- Warm-Up 2 min @ 45% (45w)
- 1 min @ 60% (60w)
- 1 min @ 66% (66w)
- 1 min @ 72% (72w)
- 1 min @ 78% (78w)
- 1 min @ 85% (85w)
- 1 min @ 92% (92w)
- 1 min @ 100% (100w)
- 5 min @ 50% (50w)
- 9X
- Vo2 4 min @ 115% (115w)
- Rest 4 min @ 50% (50w)
- Cooldown 10 min @ 45% (45w)