Tempo

Sweet Spot 1x50min 90% FTP

  • Cycling
  • 1h 19mTime
  • 91Stress
  • 0.83Intensity
  • 60Popularity

About this workout

One long 50-minute tempo push at 90% FTP. Steady aerobic work that builds capacity without the lactate burn.

SteveFX

Workout structure

  • Warm-Up 5 min @ 50-60% (50-60w)
  • Warm-Up 3 min @ 65% (65w)
  • Warm-Up 2 min @ 75% (75w)
  • Warm-Up 2 min @ 90% (90w)
  • Warm-Up 2 min @ 60% (60w)
  • Warm-Up 30 sec @ 100% (100w)
  • Warm-Up 2 min @ 50% (50w)
  • 50 min @ 90% (90w)
  • Cooldown 5 min @ 60-55% (60-55w)
  • Cooldown 5 min @ 50-45% (50-45w)
  • Cooldown 2:30 min @ 45-35% (45-35w)