Red Lake +8
- Cycling
- 1h 23mTime
- 105Stress
- 0.87Intensity
- 55Popularity
About this workout
Red Lake +8 features a solid main set of four 6-minute intervals at 108% FTP, pushing your aerobic ceiling to new heights. This workout is ideal for those looking to boost their performance for challenging climbs or high-intensity group rides.
Workout structure
- 3 min @ 60% (60w)
- 3 min @ 80% (80w)
- 2 min @ 100% (100w)
- 5 min @ 50% (50w)
- 4X
- 6 min @ 108% (108w)
- Rest 5 min @ 40% (40w)
- 6 min @ 108% (108w)
- 15 min @ 65% (65w)
- 5 min @ 65-40% (65-40w)