FTP Builder Week 7 Day 4 - Medium over/Under
- Cycling
- 1h 1mTime
- 90Stress
- 0.94Intensity
- 60Popularity
About this workout
This medium over/under workout pushes your limits with 2×5 minutes at 110% FTP, designed to raise your aerobic ceiling and build the capacity for those tough climbs or sprint finishes. Perfect for a day trainer session or to elevate your MVdP FTP, it's an essential part of your high-intensity training arsenal.
Workout structure
- 4 min @ 50% (50w)
- 1 min @ 70% (70w)
- 1 min @ 80% (80w)
- 1 min @ 90% (90w)
- 1 min @ 110% (110w)
- 2 min @ 88% (88w)
- 1 min @ 110% (110w)
- 5 min @ 50% (50w)
- 2X
- 5 min @ 105-110% (105-110w)
- 2 min @ 75% (75w)
- 5 min @ 110-100% (110-100w)
- 2 min @ 75% (75w)
- 5 min @ 105-110% (105-110w)
- 2 min @ 75% (75w)
- 5 min @ 110-100% (110-100w)
- 5 min @ 50% (50w)