E Wyt. tlenowa 65-70% FTP
- Cycling
- 1h 30mTime
- 64Stress
- 0.65Intensity
- 135Popularity
About this workout
This steady endurance session at 65-70% FTP is the perfect way to build your aerobic engine, making it ideal for long rides or base training. Think of it as the bread-and-butter workout that supports your MVDP FTP goals and primes you for upcoming FTP tests.
Workout structure
- Warm-Up 10 min @ 45-65% (45-65w)
- Active 65 min @ 68% (68w)
- Cooldown 15 min @ 65-45% (65-45w)