8x2 @ 120% 4 min rests
- Cycling
- 1h 4mTime
- 79Stress
- 0.86Intensity
- 15Popularity
About this workout
This workout features 7 sets of 2-minute efforts at 120% FTP, designed to push your aerobic ceiling and prepare you for those tough climbs or sprint finishes. Ideal for mid-week intensity, it's a solid way to build the capacity needed for group rides where every second counts.
Workout structure
- 10 min @ 65% (65w)
- 7X
- 2 min @ 120% (120w)
- 4 min @ 50% (50w)
- 2 min @ 120% (120w)
- 10 min @ 50% (50w)