4 x (3m 2m) @ 90% (late stage efforts)
- Cycling
- 20mTime
- 21Stress
- 0.80Intensity
- 31Popularity
About this workout
This workout features a classic tempo set of 4 x 3 minutes at 90% FTP, with 2-minute recoveries, designed to build sub-threshold endurance and aerobic durability for those long climbs or mid-week group rides. It’s a time-efficient way to sharpen your fitness without overcooking, perfect for fitting into a busy training schedule.
Workout structure
- 4X
- 3 min @ 90% (90w)
- Rest 2 min @ 50% (50w)