2x(7' Z3) + 3x(2' Z4) + 5x(1' Z5/Z6)
- Cycling
- 47mTime
- 53Stress
- 0.82Intensity
- 15Popularity
About this workout
This workout features a challenging main set of 2x7 minutes at 85% FTP, designed to build your kick for closing gaps and enhancing your raw sprinting power. Perfect for those looking to boost their anaerobic capacity for race kicks and breakaways.
Workout structure
- Warm-Up 7 min @ 50-85% (50-85w)
- 1 min @ 60% (60w)
- 2X
- Rest 7 min @ 85% (85w)
- 2 min @ 60% (60w)
- 2X
- Rest 2 min @ 100% (100w)
- 1:30 min @ 60% (60w)
- Rest 2 min @ 100% (100w)
- 2 min @ 60% (60w)
- Rest 30 sec @ 110% (110w)
- 30 sec @ 55% (55w)
- Rest 30 sec @ 110-120% (110-120w)
- 30 sec @ 55% (55w)
- Rest 30 sec @ 110-130% (110-130w)
- 30 sec @ 55% (55w)
- Rest 30 sec @ 110-140% (110-140w)
- 30 sec @ 55% (55w)
- Rest 30 sec @ 110-150% (110-150w)
- 30 sec @ 90% (90w)
- 5 min @ 80-50% (80-50w)