17 x 2" at 70%
- Cycling
- 1h 15mTime
- 52Stress
- 0.65Intensity
- 90Popularity
About this workout
This steady endurance session is a bread-and-butter workout for building your aerobic engine, perfect for those long group rides or when you're looking to stretch out climbs. It’s a solid way to maintain a conversational pace while accumulating time in the saddle without overdoing it.
Workout structure
- 5 min @ 55% (55w)
- 2 min @ 75% (75w)
- Rest 2 min @ 40% (40w)
- 2 min @ 70% (70w)
- Rest 2 min @ 55% (55w)
- 2 min @ 70% (70w)
- Rest 2 min @ 45% (45w)
- 6X
- 2 min @ 70% (70w)
- Rest 2 min @ 50% (50w)
- 5X
- 2 min @ 75% (75w)
- Rest 2 min @ 50% (50w)
- 2 min @ 75% (75w)
- Rest 2 min @ 55% (55w)
- 2 min @ 80% (80w)
- Rest 2 min @ 60% (60w)
- 2 min @ 85% (85w)
- Rest 2 min @ 65% (65w)
- 2 min @ 60% (60w)